EasyManua.ls Logo

Savaria Multilift - Adjusted Maintenance Schedule

Default Icon
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
20
Maintenance Schedule (Adjusted)
Some Jurisdictions have their own state, county or local code that deviate from
national code. Please fill out the below information with the requirements of
your region:
Savaria Job Number: ______________________
Installation Address: ______________________
Verification Adjusted
Verify correct operation of the phone (where
applicable).
Verify the following:
General operation of the lift
Operation of the underpan sensors
Operation of the emergency stop
Operation of the door and gate lock contacts. The
lift should not run unless the door or gate is closed
and locked.
Verify the door lock operation:
The lift is operational when the door is locked
The lift is NOT operational when the door is open at
a landing
Insert the lock key to manually unlock the door and
ensure the following:
- The lift is NOT operational when the door is
manually unlocked with the key
- The key cannot be removed from the lock
Verify that all hardware is tightened.
Check the rollers (function and wear).
Check the battery fluid level (optional system). Also check the
voltage with the charger unplugged (13 VDC unloaded and
no lower than 10-11 VDC when running up/down).
Multilift Owner’s Manual Part No. 000609, 30-m01-2024

Other manuals for Savaria Multilift

Related product manuals