EasyManuals Logo

Schaerer Barista Service Manual

Schaerer Barista
33 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #8 background imageLoading...
Page #8 background image
Installation and commissioning
Requirements:
Coffee machine installed and connected
to water and power supply.
See chapter 1.1 – 1.2.2
Basic settings
Language selection
Enter water hardness reading into information pad
If fitted, activate pre-rinsed water filter under System and enter
the filter capacity taken from the cutting table.
Check machine configuration and correct if necessary:
Power Class, Low pressure, RDA, External Tank,
Accounting ...
Enter the Service address(es)
Check Date time / timezone
(One-time query when switched on for
the first time)
Caution: The date can NOT be changed
later!
Switch on machine, check time / time zone. Change
where necessary. Confirm date of commissioning.
Confirmation is requested only when switched on for the
first time.
The date setting starts the maintenance counters and
service intervals.
Enter the machine name for the data back-up filename.
E.g.: Serial number and name of the company
The machine fills up automatically and heats up
System > Language
System > Water filter
(Service PIN must be
entered)
Service > Machine configuration
(Service PIN must be entered)
Service > Service address(es)
Service > Machine master data

Other manuals for Schaerer Barista

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Schaerer Barista and is the answer not in the manual?

Schaerer Barista Specifications

General IconGeneral
Power Supply220-240 V, 50/60 Hz
Grinder TypeCeramic
InterfaceTouchscreen
TypeAutomatic Coffee Machine
StyleCountertop
Boiler TypeStainless steel
ProgramsMultiple

Related product manuals