EasyManua.ls Logo

Schenker WIKI - 6.6.2 Shutdown Operating Procedure

Default Icon
31 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6 MAINTENANCE (ROUTINE AND SPECIAL) REV.02
EN
THE PRESENT MANUAL BELONGS TO - Schenker Italia - ALL RIGHTS RESERVED
25
6.6.2 Shutdown operating procedure
1. Prepare the solution carefully mixing the bottle of
SC1(or SC2) in about 15 litres of unchlorinated
water.
2. Connect the 2 maintenance hoses to watermaker
as indicated above, and dip them in the solution.
3. Check they are well submerged in the solution
and don't suck air.
4. Open the depressurization valve.
Pipes under the free water surface

Related product manuals