EasyManua.ls Logo

SCHUNK MPG-plus 12 - Pneumatic Connection

SCHUNK MPG-plus 12
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Assembly
22
13.00 | MPG-plus | Assembly and operating manual | en | 389216
5.2.2 Pneumatic connection
NOTE
Only use carbide bits to remove the bottom grub screws.
Compressed air connections
1 Main connections (Hose connection)
(A = open, B = close)
2 Hose-free direct connection at the base
(a = open, b = close)
Hose-free direct connection
3 Product
4 O-ring
5 Attachment
Item Mounting
MPG-plus
10 12 16 20 25 32 40 50 64
1 Thread in the
main air
connections
* * * M3 M3 M5 M5 M5 M5
Max. depth of
engagement [mm]
- - - 3 3 4.5 5 5 5
2 Thread in Hose-
free direct
connection
- - M
2.5
M
2.5
M3 M3 M3 M3 M3
* For this size, the hose clips are pre-assembled at the factory and
the compressed air hoses prescribed by SCHUNK must be used,
see catalog data sheet. Procedure for leaking compressed air
connection, see section "Troubleshooting".

Table of Contents

Related product manuals