EasyManua.ls Logo

Sega F355 Challenge - Communication Play; Installation Precautions; Connecting the Communication Cables

Sega F355 Challenge
143 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
85
www.seuservice.com
20. COMMUNICATION PLAY
For this game, 4 machines can be connected
to allow up to 8 players to play
simultaneously.
20 - 1 INSTALLATION PRECAUTIONS
1) When linking a number of machines, be sure
to supply sufficient power for the corre-
sponding number of machines. The per unit
standard voltage/amperage is 100 X 120V/
10A and 220 X 240V/5A.
2) Due to the length of the communications
cable, the distance in between the machines
will be approximately 0.2 meters or less.
AC COVER B
HOLE LID
TRUSS HEAD SCREW (2EA) M3 X 8, black
w/flat & spring washers
SCREW, black (4)
M4 X 8,w/flat & spring washers
20 - 2 CONNECTING THE COMMUNICATION CABLES
The PROTECT TUBE is used to link plural machine units and the communication cables are
caused to pass through the PROTECT TUBE. Depending on the number of machine units to be
linked, connect the communication cables (optic fiber cables) in the manner shown in Figures
20. 2 f and 20. 2 g.
Take off the 4 screws and remove AC COVER B (Fig. 20. 2 a).
The HOLE LID is attached to the AC COVER HOLE into which the PROTECT TUBE is to be
installed. By taking off 2 screws, remove the HOLE LID of the side where the PROTECT
TUBE is to be installed.
APPROXIMATELY 0.2m
FIG. 20. 2 a
1
2

Other manuals for Sega F355 Challenge

Related product manuals