EasyManua.ls Logo

Sega Sonic Allstarts - 3. SET-UP Position & Maintenance; Placement and Clearance Requirements; V. Introduction of Product Appearance; Main Control Part Overview

Sega Sonic Allstarts
46 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 22 -
3.
SET-UP Position & maintenance
V.
Introduction of Product Appearance
Main Control Part is inside the cash door.
IC board includes
power,fuse,audit and test
functions
Please see1 Link
adjustmentfor IC board
function.
Fix po
sition after assembly
1.Hoist the machine from the hoist
point.
2.Keep at least 50cm(20”) space
from the back for maintenance
and to avoid over heating.
Electrical plug display
50CM(20’’)
Attention:
The power must be turned off before any movements.
Check the power rate before use A C110V~120V/AC220V~240V,
Check Electrical plug display as a glide.

Related product manuals