Section 2 Installation Instructions
Part Number 020004000 10/13 2-17
CARBONATED/NON-CARBONATED CONVERSION
INSTRUCTIONS
CEV BAG-IN-BOX (BIB) START-UP
All lines should be properly flushed and sanitized before
starting the CEV. See Sanitizing Instructions
1. Connect each BIB connector to the appropriate BIB.
2. Gradually adjust the secondary regulator to 70 psi
(482.6 KPa). Never run a BIB pump without the BIB
installed as the pump could be damaged. Set final
secondary regulator pressure 70 -75 psi (482.6 -
517.1 KPa) depending on the line size and the
distance of the run.
3. Operate each dispensing valve until the syrup flows
smoothly from the valve.
Adjust Syrup to Water Ratio (Brix) of Dispensed
Product
1. Adjust water flow rate on each dispensing valve to
2.5 ounces per second.
2. Adjust dispensing valves for water-to-syrup ratio
(brix) as recommended by the syrup distributor.
INSTALL LABELS
Install flavor labels (some labels are provided with the CEV)
on the dispensing valve covers.