VL-PD3S/H/E
VL-PD3S/H/E
8-4
8-5. Reassembly
8-5-1. Reassembly in side of the main chassis.
Note) Numbers before part names are given as a guide to the order of assembly.
As for greasing/oiling/cleaning places refer to the attached drawings (Grease/Oil application Fig. 1, 2).
1.
Groove grease
(2) Pinch drive lever
303
361
301
Shaft grease
2.
B-5
B-2
(3) Dew FPC cover
314
325
463
441
301
B-3
B-4
B-1
Mode FPC
A-2
A-3
(1) Mode switch
(2) Mechanism fixing angle
assembly (Rear surface)
Note) The numbers following
A and B indicate the
screw tightening order.
Item
Tightening torque
Quantity
A S Tight · M1.4 x L3 70mN·m 3
B S Tight · M1.4 x L2 70mN·m 5
Item
Tightening torque
Quantity
B S Tight · M1.4 x L2 70mN·m 1
C CWø1.2-ø3.0-t0.25 2
3.
(6) AHC cam
C
C
Cam groove grease
(1) EJECT
lever
Groove
grease
B
309
302
379
370
371
304
310
369
314
Positioning
hole
(7) T arm
control lever
(3) Main cam
To cam
groove
Positioning hole
To cam groove
(8) AHC control lever
(5) Coupling
gear
(4) Sub cam
(2) Lock lever guide
4.
D
D
B
C
To cam groove
D
(4) Tu guide cam
(5) Capstan motor
(2) Shifter drive
lever assembly
D
(3) Loading lever
Groove grease
To cam groove
Item
Tightening torque
Quantity
B S Tight · M1.4 x L2 70mN·m 2
C CWø1.2-ø3.0-t0.25 1
D Special screw · 40mN·m 4
M1.4 x L1.6
366
312
364
365
421
459
367
(3) Timing belt
(4) Intermediate gear angle
sub assembly
(1) Intermediate pulley
assembly
(2) Center pulley assembly
B
5.
Item
Tightening torque
Quantity
B S Tight · M1.4 x L2 70mN·m 1
6.
Item
Tightening torque
Quantity
E Special screw · 40mN·m 2
M1.4 x L1.5
Guide rail sub assembly
(Rear surface)
Phase match check
(1) Guide rail sub
assembly
Enter part of
convexity
rear surface
Phase match check
(1) Pinch control lever
Main chassis assembly
(Rear surface)
A-1
(1)Slide chassis guide
Drawing part
grease
B
Mechanism fixing angle
Main chassis assembly
(Front surface)
E
E