EasyManua.ls Logo

Shimadzu ASC-7000 User Manual

Shimadzu ASC-7000
94 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Read the instruction manual thoroughly before you use the product.
Keep this instruction manual for future reference.
206-97193
Feb. 2009
Shimadzu Autosampler
ASC-7000
INSTRUCTION MANUAL

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Shimadzu ASC-7000 and is the answer not in the manual?

Shimadzu ASC-7000 Specifications

General IconGeneral
BrandShimadzu
ModelASC-7000
CategoryLaboratory Equipment
LanguageEnglish

Summary

Introduction

Safety Instructions

Application and Installation Precautions

Covers safety guidelines for using the instrument and selecting installation sites.

Work, Operation, and Static Electricity Precautions

Details safety measures for operating the instrument and preventing static electricity hazards.

Chemical Handling and Maintenance Safety

Outlines safe practices for handling chemicals and performing instrument maintenance.

Precautions on Use

Emergency Action

Emergency Action Steps

Provides step-by-step instructions for responding to emergencies or abnormalities.

Warning Labels on the Instrument

Rotating Part Warning Label

Details the warning label for the rotating part of the instrument.

Warranty and After-Sales Service

Warranty Details and Exceptions

Explains the product warranty period, coverage, and common exclusions.

After-Sales Service and Parts Availability

Describes procedures for obtaining service and the availability of replacement parts.

Handling Waste Liquid

Waste Liquid Handling Precautions

Provides warnings and guidelines for selecting chemical-resistant containers for waste.

Disposal Precautions

Gives instructions for instrument disposal and waste liquid management.

Action for Environment (WEEE)

Information regarding the disposal of electronic equipment in the European Union.

Regulatory Information

European Compliance Requirements

Lists the European directives and regulations the product complies with.

Chapter 1 Overview

Overview of the ASC-7000

Introduces the functions and capabilities of the ASC-7000 autosampler.

Parts Information

Lists the standard and optional parts included with the ASC-7000 instrument.

Installation Guide

Provides information and guidance regarding the installation of the instrument.

Function and Name of Each Part

Identifies and explains the function of various parts of the ASC-7000 Sampler ASSY.

Chapter 2 Basic Operation

Power ON/OFF Procedures

Details the steps for activating and quitting the ASC-7000 instrument.

Instrument Initialization

Explains the automatic initialization process when the instrument is powered on.

Nozzle Mounting and Position Adjustment

Guides on mounting different nozzles and adjusting their positions for optimal sample injection.

Syringe Handling and Setup

Instructions for mounting, setting volume, and changing syringes for the autosampler.

Sample, Reagent, and Rinse Liquid Preparation

Procedures for preparing samples, reagents, and rinse liquid, including turntable orientation.

Waste Liquid Management

Describes the waste liquid drainage systems and handling precautions for the instrument.

Sampler Sliding Mechanism

Instructions on how to slide the sampler for different measurement methods (Flame/Furnace).

Chapter 3 Software Operation Flow and Basic Operation

Overview of Software Parameters

Outlines the necessary parameters for operating the autosampler with the AA-7000 series.

Setting ASC Parameters

Explains how to configure parameters for mixing, intake/discharge speed, and reagent settings.

Setting Preparation Parameters

Guides on setting calibration curve, blank, reslope, and sample preparation parameters.

Chapter 4 Maintenance

Daily and Periodical Inspections

Describes routine checks to ensure the instrument remains in good working condition.

Replacing Pipet Tip

Step-by-step guide for replacing the pipet tip to maintain measurement accuracy.

Peristaltic Pump Tube Replacement

Instructions for replacing the peristaltic pump tube when flow rate decreases.

PTFE Tube Replacement (Nozzle ASSY, G)

Procedure for replacing the PTFE tube for the Nozzle ASSY, G for furnace measurement.

Nozzle Flow Path Rinsing

Method for cleaning the internal flow path to prevent bubble formation and contamination.

Syringe Cleaning Procedure

Detailed steps for dismounting and cleaning the instrument's syringe.

Maintenance and Repair Parts

Lists parts that require regular maintenance and their recommended replacement intervals.

Chapter 5 Troubleshooting

Responding to Trouble

Provides a guide to common symptoms, their causes, and recommended actions for resolving issues.

Chapter 6 Technical Information

Basic Specifications

Lists the technical specifications for the ASC-7000 autosampler, including common and method-specific details.

Chemical Compatibility

Details the chemicals that can be used with the instrument for different measurement methods.

Optional Parts List

Lists available optional parts for various measurement methods and accessories.

Instrument Placement and Site Requirements

Specifies the recommended installation site conditions and component placement.

Equipment Power Requirements

Outlines the electrical requirements, including voltage, power capacity, and connections.

Related product manuals