Building Technologies Basic Documentation LMV5... CC1P7550en
9 Commissioning instructions for the LMV5 22.05.2018
P
G
= 30 mbar
P
W
= 15 mbar
P
atm
= 1013 mbar
V = 3 l
Q
Leck
= 50 l/h
(30 - 15) mbar 3 l 3600 s / h
t
Test
=
= 3,2 s
1013 mbar 50 l/h
Result: The test time to be set is 4 seconds
P
G
= 30 mbar
P
W
= 15 mbar
P
atm
= 1013 mbar
V = 3 l
t
Test
= 4 s
(30 - 15) mbar 3 l 3600 s/h
Q
Leck
=
= 40,0 l/h
1013 mbar 4 s
Result: The detected leakage rate is 40 l/h
Example 1 (calculation
of test time)
Example 2 (determination
of detectable leakage
rate)

Table of Contents

Other manuals for Siemens LMV52 series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens LMV52 series and is the answer not in the manual?

Siemens LMV52 series Specifications

General IconGeneral
Flame safeguard controlYes
Air damper controlYes
Fuel controlYes
Ignition controlYes
ApprovalsCE, UL, CSA
Operating Temperature-20...+60 °C
CertificationEN 298, EN 230

Related product manuals