EasyManua.ls Logo

Siemens milltronics - Chain reel

Siemens milltronics
26 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing/Mounting
5.4 Chain reel
Milltronics Test Chain
Operating Instructions, 10/2021, A5E32310082-AB
11
5.4 Chain reel
Location
On incline conveyors, the chain reel must be carefully installed upstream of the scale
weighbridge so the chain rolls out with the movement of the belt. "Upstream" is when you
look from the conveyor tail or infeed end towards the head or discharge end of conveyor.
On a level conveyor, locate the reel prior to the scale position.
Facilitate chain rollout over the scale by jogging the belt until the chain is in position.
Mount the reel to the conveyor about 4 to 4.5 idler spaces from the scale center line. This
places the support legs of the reel about 1.5 spaces from the end of the test chain for easy
attachment to the restraining device.
Once the chain has been secured at both ends, the cable from the reel can be detached and
the belt restarted for the calibration process.

Other manuals for Siemens milltronics

Related product manuals