SDQLCAI-1 Installation
May 2002 2-17
To make wiring connections to a CAI/SAI Marshalled Termination Assembly:
1. From your system’s documentation and wiring diagrams, identify each channel and its assigned field
cable ID.
2. Prepare the field cable ends as needed.
3. Identify each channel to be wired. Consult your system’s wiring diagrams and connect the field cable
wires to the appropriate terminals.