EasyManua.ls Logo

Siemens SINAMICS G120 - 3 Installing; Plugging the Control Unit Onto the Power Module

Siemens SINAMICS G120
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CU240B-2 and CU240E-2 Control Units
Compact Operating Instructions, 04/2015, A5E35792002B AA
7
Installing
3
3.1
Plugging the Control Unit onto the Power Module
Permissible Power Modules
You may operate the Control Unit with the following Power Modules:
Power Module
โœ“ = operation with Power Module permissible,
--- = not permissible
CU240B-2
CU240E-2
PM340 1AC
---
โœ“
PM230 IP20 and push-through โœ“ โœ“
PM240
โœ“
โœ“
PM240-2 โœ“ โœ“
PM250
โœ“
โœ“
PM260
โœ“
โœ“
Plugging the Control Unit onto an IP20 Power Module FSA โ€ฆ FSF
Procedure
Proceed as follows to plug the Control Unit
onto a Power Module:
1.
Locate the lugs at the rear of the Control
Unit in the matching recesses of the
Power Module.
2.
Press the Control Unit onto the Power
Module until you hear it latch into place.
You have now plugged the Control Unit onto the Power Module.
To remove the Control Unit, press on the release button on the Power Module and withdraw
the Control Unit.

Other manuals for Siemens SINAMICS G120

Related product manuals