EasyManua.ls Logo

Siemens SINAMICS G120 - Page 9

Siemens SINAMICS G120
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing
3.2 Overview of the interfaces
CU240B-2 and CU240E-2 Control Units
Compact Operating Instructions, 04/2015, A5E35792002B AA
9
Table 3- 2 Permissible cable and wiring options
Solid or flexible conduc-
tors
Finely stranded con-
ductor with non-
insulated end sleeve
Finely stranded con-
ductor with partially
insulated end sleeve
Two finely stranded
conductors with the
same cross-section
with partially insulated
twin end sleeves
Wiring the terminal strip in compliance with EMC
If you use shielded cables, then you must connect the shield to the mounting plate of the
control cabinet or with the shield support of the inverter through a good electrical
connection and a large surface area.
Use the shield connection plate of the Control Unit as shield support and strain relief.
Table 3- 3 Article numbers
Shield connection kit 2 for the CU240B-2 and CU240E-2 Control Units with
all fieldbus interfaces except for PROFINET.
6SL3264-1EA00-0HA0
Shield connection kit 3 for the CU230P-2 and CU240E-2 Control Units with
PROFINET interface
6SL3264-1EA00-0HB0
Further information about EMC-compliant wiring is available on the Internet: EMC installation
guideline (http://support.automation.siemens.com/WW/view/en/60612658)
Interfaces at the lower side of the CU240B-2 and CU240E-2 Control Units

Other manuals for Siemens SINAMICS G120

Related product manuals