Commissioning
4.2 Commissioning with BOP-2 operator panel
SINAMICS G120C converter
58 Getting Started, 04/2014, FW V4.7, A5E34264105B AA
p9801 SI enable, functions integrated in the drive
SI PROFIsafe address (processor 2)
SI F-DI changeover, tolerance time (processor 2)
SI STO debounce time (processor 2) [μs]
SI common functions (processor 2)
CO/BO: SI status (Power Module)
SI actual checksum SI parameters (processor 2)
p9899 SI reference checksum SI parameters (processor
Computation time utilization
Highest gross utilization
Selecting a PROFIsafe telegram