Connecting up, switching on
4.4 Installation set for line-side cable connection, left
Power Module PM330
46 Hardware Installation Manual, 10/2016, A5E32844552B AD
3. Final state with mounted installation set, tightening torque for the fixing screws ⑤: 50 Nm
Figure 4-11 Installing the mounting kit, step 3
4. The cable entry protection ⑥ must be broken out corresponding to the diameter of the
cable to be introduced.
Figure 4-12 Installing the mounting kit, step 4