EasyManua.ls Logo

Siemens SION 3AE5 - Electrical connection of the main conductors

Siemens SION 3AE5
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
9229 0025 176 0A 49
2019-08-05
Electrical connection of the main conductors
The conductor bars can be purchased from the Siemens Service Center.
Preparing contact surfaces
DANGER
High-voltage - danger to life
Checking the vacuum circuit-breaker in the panel when high voltage is applied is
only permitted after full functionality has been determined (refer to “Commission-
ing” on page 57).
Note
Grease the conductor bars with Vaseline prior to installation.
Note
For screw-in depths for screws or threaded rods and
impact depths for dowel pins or coiled spring pins, see table “Screw-in
depths”, Fig. 79.
Note
Clean silver spray-plated and copper spray-plated connecting surfaces with a
cloth; do not brush.
Different connection materials (AI/CU) must not be cleaned with the same clean-
ing tools.
Silver-plated parts must not be bolted to aluminium bars!
Fig. 77 Cleaning the connecting surfaces Fig. 78 Cleaning the connecting surfaces of the con-
ductor bars

Related product manuals