5.4.4 Commissioning with vapor


Pressure transmitter Drain valves
Stabilizing valve Condensate pots
, Differential pressure valves Differential pressure transducer/Orifice plate
Differential pressure lines Insulation
Shut-off valves
Figure 5-2 Measuring steam
Condition
All valves are closed.
Procedure
NOTICE
The measuring result is error-free only if the differential pressure lines have equally high condensate columns with the
same temperature. The zero calibration must be repeated if required if these conditions are fulfilled. If the shut-off valves
and the differential pressure valves are open at the same time and the stabilizing valve is opened, there is a
possibility of the transmitter
being damaged due to the streaming vapor.
To commission the transmitter for vapor, proceed as follows:
1. Open both the shut-off valves
at the pressure tapping point.
2. Open the stabilizing valve
.
3. Wait until the steam in the differential pressure lines
and in the equalizing vessels has condensed.
4. Open the differential pressure valve
and the vent valve on the positive side of the transmitter slightly, until
condensate escapes without bubbles.
5. Close the vent valve.
6. Open the vent valve on the negative side of the transmitter
slightly, until condensate escapes without bubbles.
7. Close the differential pressure valve
.
8. Open the differential pressure valve
slightly, until condensate escapes without bubbles, then close it.