EasyManua.ls Logo

SIFANG CSC-1321 - User Manual

SIFANG CSC-1321
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
CSC-1321
Gateway User Guide
Question and Answer IconNeed help?

Do you have a question about the SIFANG CSC-1321 and is the answer not in the manual?

Summary

Preface

Safety Information

Provides critical safety precautions for operating the Gateway device.

Opening Inspection

About this chapter

Introduces the scope of the chapter, focusing on open package inspection of the Gateway.

Installation and Commissioning

About this chapter

Describes the installation process and pre/post-energization inspections for the Gateway.

Installation

Details the physical installation steps, including fastening, grounding, and wiring of the device.

Inspection Before Powering On

Outlines checks for mechanical parts, wiring, connectors, and module settings before initial power-up.

Insulation Resistance Measurement

Specifies the procedure and requirements for measuring insulation resistance using a magneto-ohmmeter.

Power-On Inspection

Lists checks to perform after powering on the device, including LCD display, indicators, and keyboard.

Device Terminal Description

About this chapter

Explains the purpose of the chapter, which is to describe modules and terminal definitions for the Gateway.

Main CPU Module

Describes the DB9 serial port and Ethernet RJ45 ports on the main CPU module.

Ethernet Module

States that the Ethernet module's external terminal is the same as the main CPU module's.

Serial Port Module

Details the 20-wire Phoenix terminal for RS232/RS485 serial ports and working mode definitions.

Binary Input;Output Module

Describes the 20-wire Phoenix terminal for binary inputs and outputs, including terminal definitions.

Time Synchronization

Explains dial switch settings for time synchronization module addresses and synchronous clock types.

Power Module

Details the 8-wire Phoenix terminal for 220V AC/DC and 110V DC input power modules.

Human-Machine Interface and Operation

About this chapter

Introduces the chapter's content, covering HMI, menu operation, and display of the Gateway.

Front Layout of the Device

Explains the elements on the front panel, including indicators, LCD screen, and function buttons.

Display Under Normal Operation

Describes the LCD display behavior during normal operation, including time, page indicators, and status updates.

Menu and Operation

Details the hierarchical menu structure and functions, referring to a table for menu levels.

Operation and Maintenance

About this chapter

Outlines the scope of the chapter, focusing on the operational and maintenance rules for the Gateway.

Inspection Before Operation

Lists checks to perform before operating the Gateway, focusing on indicators, MMI, and display consistency.

Notes During Operation

Provides essential notes and prohibitions during normal operation, including key presses and configuration modifications.

Common Failures and Countermeasures

Details common phenomena, their causes, and handling methods for typical Gateway failures.

Transportation and Storage

About this chapter

Describes the recommended transportation and storage conditions for the Gateway device.

SIFANG CSC-1321 Specifications

General IconGeneral
BrandSIFANG
ModelCSC-1321
CategoryGateway
LanguageEnglish