Page
17
Reference
Number
Explanaon
1
The “Fan” switch will turn the fan and unit on.
2
The “Load” switch will apply the set load to the tesng source.
3
The “Vavg” is the average voltage of the load.
4
This secon will designate the phase in which the load bank is running. It can be in 1Ph
(single phase) or 3Ph (3-phase).
5
The “Available” secon is how much KW is available for use.
6
The “Running” is the amount of KW load bank has aempted to apply.
7
The “Normal Operaon” secon will remain normal unless an error appears. Touch-
ing here, “ERR” (Reference Number 10), or F1 will access the errors and allow you to
address the issues.
8
The “Entry” value is the value entered that you desire for the load. When touched, a
number pad will appear for entering values.
9
The “Metered” secon is the amount of KW the load bank has applied as read from
the on-board digital meter.
10
The “ERR” selecon will load the error tab for the HMI. If any errors are acve, then
this tab will show what is causing the errors.
11 & 12
The JG+ and JG- values are abbreviaons for “Jog Up” and “Jog Down,” respecvely.
These will increase or decrease the KW entry by a value set in the setup (See Refer-
ence 14).
13
The “MTR” (Meter) buon will display the metering screen.
14
The “SHF” (Shi) buon will reveal newer funcons of “AJG” and “SET” on the boom
of the screen where the funcon buons are.
15
The “AJG” (Auto-Jog) buon will allow you to set the Auto-Jog funcons. By using a
minimum and maximum value as well as seng the steps and duraon to go from the
minimum to the maximum, the auto-jog will run in a loop unl stopped.
16
The “SET” buon will load the setup menu. Please see “6.6.1 Setup Informaon” on
page 20 for more informaon on the setup menu.
Table 2 Screen Denitions