6.5 Shutdown
1. To shut down the Load Bank, de-energize the load by switching the
“Load” switch to “O.
2. Select the “Fan” switch to “O.” The unit will begin a cooldown phase
for a set duraon. If desired, the cooldown mer can be set to zero.
3. Disconnect all the connecons to the load bank and store the load
bank as desired.
6.6 Addional Screens and Programming Informaon
6.6.1 Setup Informaon
There are a few features that need to be setup behind the scenes for the load
bank. These sengs are located in the Setup menu. From this menu, you will
be able to set the “Jog” steps , the “Cooldown” mer, and include manual load
steps. From this Setup screen, you can also view the KWHR, which serves as an
odometer.
For an explanaon of the parts of the Setup menu, please see Figure 9 and Table
3 Setup Screen Denions below.
Figure 9 Setup Explanations