GTJZ0612E&0812E&1012E&1212E Operation Manual A-5 © Jun 2020
APPENDIX 2: PREPARE THE WORK
RECORD BEFORE DELIVERY
PREPARE THE WORK RECORD BEFORE DELIVERY
Model
Serial No.
Inspection Item
YES/Machine is in
Good Condition
NO/Machine Has Damage
or Malfunction
REPAIRED/Machine
Has Been Repaired
Pre-operational Inspection
Maintenance Procedure
Functional Inspection
Machine Buyer/ Renter
Inspector Signature
Inspector Title
Inspector Company
NOTE:
1. Prepare the machine before delivery, which includes performing a pre-delivery inspection, following mainte-
nance procedures and performing functional inspections.
2. Use the table to record the results. After each section is complete, mark the appropriate box.
3. Record the inspection results. If any inspection results are "NO", the machine must be stopped and re-in-
spected after repair is completed and marked in the box marked "inspection".