GTZZ25J Operation Manual 8-1 © Nov. 2022
8 TRANSPORTING AND LIFTING THE
MACHINE
TRANSPORTATION AND LIFTING
HAZARD
Use a forklift or crane with the
proper lifting capacity to lift the
machine. Use good judgment and
planned movement to control the
machine.
The transport vehicle must be
parked on level ground.
The transport vehicle must be
secured from rolling when the
machine is loaded.
Ensure that the vehicle capacity,
loading surface, belts or ropes are
sufficient to support the weight of
the machine, refer to 1
Performance Parameters, page 1-
1.
Before driving the machine onto
the transport vehicle, ensure that
the slope is within the machine
gradeability, refer to 1
Performance Parameters, page 1-
1.
Before transportation and lifting,
check if the rigging anchor point
and its attached structure are in
good condition.
Be sure the machine is on a level
surface or secured before
releasing the brake.
Never transport people on the
machine while the machine is
being towed, lifted or dragged.
The machine should be towed/
dragged following the local laws
and traffic rules.
When using a forklift or crane to
lift the machine, try to prevent the
machine from colliding with
nearby objects.
Lock the wheels of the machine
after it has been loaded to prevent
the machine from rolling.
NOTICE
Do not tow/drag the machine unless an emergency,
failure or loss of power occurs. Refer to Emergency
Towing/Dragging, page 7-3.