EasyManua.ls Logo

Sinoboom GTZZ25J - Appendix 2: Prepare the Work Record before Delivery

Default Icon
94 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GTZZ25J Operation Manual A-3 © Nov. 2022
APPENDIX 2: PREPARE THE WORK
RECORD BEFORE DELIVERY
PREPARE THE WORK RECORD BEFORE DELIVERY
Model
Serial No.
Inspection Item
YES/Machine is in
Good Condition
NO/Machine Has
Damage or Malfunction
REPAIRED/Machine
Has Been Repaired
Pre-operational Inspection
Maintenance Procedure
Functional Inspection
Machine Buyer/ Renter
Inspector Signature
Inspector Title
Inspector Company
NOTE:
1. Prepare the machine before delivery, which includes performing a pre-delivery inspection, following
maintenance procedures and performing functional inspections.
2. Use the table to record the results. After each section is complete, mark the appropriate box.
3. Record the inspection results. If any inspection result is “NO”, the machine must be stopped, and then re-
inspected after repair is completed, and the box marked “REPAIRED” shall be checked.

Table of Contents

Other manuals for Sinoboom GTZZ25J

Related product manuals