EasyManua.ls Logo

SMC Networks EZ Switch SMCGS8P-Smart - Rack Mounting

SMC Networks EZ Switch SMCGS8P-Smart
66 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Mounting
3-3
3
Rack Mounting
Before rack mounting the switch, pay particular attention to the following factors:
Temperature: Since the temperature within a rack assembly may be higher than
the ambient room temperature, check that the rack-environment temperature is
within the specified operating temperature range (See page C-1.).
Mechanical Loading: Do not place any equipment on top of a rack-mounted unit.
Circuit Overloading: Be sure that the supply circuit to the rack assembly is not
overloaded.
Grounding: Rack-mounted equipment should be properly grounded. Particular
attention should be given to supply connections other than direct connections to
the mains.
To rack-mount devices:
1. Attach the brackets to the device using the screws provided in the Bracket
Mounting Kit.
Figure 3-2 Attaching the Brackets

Table of Contents

Other manuals for SMC Networks EZ Switch SMCGS8P-Smart

Related product manuals