12-3 Remote operation
・For the remote operation, turn on and off the power supply side under the condition of the Switch
with Lamp ON.
・Ensure at least 3 minutes is left after the unit is stopped before restarting it, even for the remote
operation. If the product is restarted within less than 3 minutes, protective equipment (overload
relay) may activate and prevent the product from restarting.
Additionally, the frequency to start and stop the operation must be restricted to 5 times per hour (to
prevent breakage of the motor).
12-4 How to connect the power supply and signal cable
Connect the power cable and signal cable in the following procedures.
1) Take off the rear panel.
2) Insert the power cable prepared by the customer into the power cable inlet (with rubber
grommet) and bring the power cable near the terminal block through the base hole.
3) Connect the power cable to the terminal.
4) Insert the signal cable prepared by the customer into the signal cable inlet (with rubber
grommet) and bring the signal cable near the terminal block.
5) Connect the signal cable to the each terminal.
6) Put back the rear panel.
Customer connection side
Terminal connecting screw: M3
Crimping terminal width: 6.5mm and below
Applicable electrical wire:1.25mm
2
or more