EasyManua.ls Logo

SMC Networks LFE series - Page 11

SMC Networks LFE series
33 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
-10-
No.LFE****-OMZ0012
* Adjustment and Operation
- Check the load status before turning the power supply on.
- Do not short-circuit the load.
Over current may lead to the damage of the product.
- Supply the power when there is no flow.
- There will be a drift on the analogue output for 5 minutes after the power supply is turned on.
- The product doesn’t produce and output signal for 3 seconds after the power is supplied.
* Maintenance
- Confirm safety by turning off the power supply and stopping the flow before performing maintenance.
There is a risk of unexpected malfunction.
- Perform regular maintenance and inspections.
There is a risk of unexpected failure of components due to the malfunction of equipment and machinery.
- Do not use solvents such as benzene, thinner etc. to clean the product.
This may damage the surface of the body or erase the markings on the body.
Use a soft cloth to remove stains.
For heavy stains, use a cloth soaked with diluted neutral detergent and fully squeezed, then wipe up the stains
again with a dry cloth.

Related product manuals