EasyManua.ls Logo

Snapper 1650 - New Tractor Pre-Delivery Inspection Check List

Snapper 1650
42 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
FACTORY
RECOMMENDED
NEW
TRACTOR
PRE-DELIVERY
INSPECTION
CHECK
LIST
Customer:
Date
Address
Tractor
Model-Serial
No.
__Engine
No_
THIS
PRE-DELIVERY
INSPECTION
CHECK
LIST
IS
PROVIDED
TO
IDENTIFY
THE
ITEMS
CHECKED
AND
IF
NECESSARY
ADJUSTED
BY
THE
DEALER
PRIOR
TO
DELIVERY
OF
THIS
MACHINE.
INSPECT
THE
FOLLOWING
AND
ADJUST
IF
NECESSARY
ENGINE
Engine
Oil
Level
All
oil
drain
plugs
Fuel
line
connections
Service
air
filter
Electrical
connections
Choke
control
Throttle
control
Activate
battery
Alternator
charging
Engine
RPM
(idle)
Engine
RPM
(full
throttle)
Carburetor
adjustment
Governor
performance
Safety
Switch
Operation
Transaxie
oil
level
Lubricate
fittings
Clutch-brake
adjustment
Steering
gear
Mower
level
CHASSIS
Mower
blade
timing
Torque
all
chassis
bolts
Wheel
bolts
(rear)
Tire
pressure
Drive
test
Is
Operator’s
Manual
with
Tractor
INSPECTION
PERFORMED
BY:
Signature
Instruments
and
Controls
Wheel
tread
adjustment
Operating
procedures
Lubrication
Explain
the
following
to
the
owner
Air
filter
service
Tire
and
battery
care
Storage
Operator's
Manual
Safety
Instructions

Related product manuals