BTS E5~20-DS5 user manualV1.1
Copyright © Shenzhen SOFARSOLAR Co., Ltd
product from voltage sources. All
work on the product must be carried
out by qualified persons only.
The battery module can get hot
during operation. Avoid contact
during operation.
Connect the battery module to the
ground bar for grounding protection
Read all documentation supplied
with the product before install
Sings on the battery distribution unit
The battery distribution unit carries a number of safety related labels.
Make sure to read and understand the labels carefully before installing
the device.
This is a
residual voltage
in the battery
module!
There is a high voltage,when the
battery is powered on. After the
battery is powered off, the internal
capacitor is still charged,operator
should wait for 5 minutes to ensure
the capacitor is completely
discharged.
Caution of high
voltage and
electric shock
The battery module operates at high
voltages. Prior to performing any work
on the product, disconnect the product
from voltage sources. All work on the
product must be carried out by
qualified persons only.
The battery module can get hot during
operation. Avoid contact during
operation.
Connect the battery module to the
ground bar for grounding protection
Read all documentation supplied with
the product before install