BTS E5~20-DS5 user manualV1.1
Copyright © Shenzhen SOFARSOLAR Co., Ltd
3.4.
Installation Space
To ensure sufficient space for installation and heat dissipation, reserve
enough space around the BTS series battery system. The requirements
are as follows:
Figure. 3-2 Installation space diagram
3.5. Battery system installation