3.1. Checking Before Installation
Checking Outer Packing Materials
Packing materials and parts can be damaged in transit. Therefore, check
the packing materials of battery modules and BDU before installing them.
Check whether the outer packing materials are damaged, such as holes
and cracks. If any damage is found, please do not open the package and
contact the distributor as soon as possible. It is recommended that you
remove packing materials within 24 hours before installation.
Checking packing list
After the battery modules and BDU are unpacked, check whether the
packaging and accessories are intact. If any damage is found or any
components are missing, contact the distributor.
Do not install batteries on flammable materials.
Do not install batteries in places where flammable or
explosive materials are stored.
The enclosures and fins are very hot when battery
modules is operated, so do not install battery systems
where you may inadvertently come into contact with
them.
Consider the weight of the battery module when
transporting and moving it. Select suitable mounting
position and surface. At least two persons are required to
install battery modules.