BTS E5~20-DS5 user manualV1.1
Copyright © Shenzhen SOFARSOLAR Co., Ltd
1) Battery type settings:
3. Set the
mandatory
full -
charge
time
2) Set discharge depth: Set the following parameters as required:
①Discharge depth:② EPS discharge depth:③EPS restore the
discharge
3) Set the mandatory full - charge time(The time difference is no less
than 3 hours)
4) Save
Note: If batteries are connected to both battery channels of the inverter,
perform the preceding steps to set battery parameters for batteries 1 and
2.
Configures an address automatically
After battery parameters are set, ensure that the system has reliable PV
or utility power supply.
Configu
res an
address
automa
tically
Configure
s an
address
automatic
ally:
Note:
The online batteries quantity is displayed on the auto IP address
configuration page. You can configure the IP address
automatically only after comparing the connected batteries