EasyManuals Logo

Sofar solar BTS Series User Manual

Sofar solar BTS Series
62 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #50 background imageLoading...
Page #50 background image
BTS E5~20-DS5 user manualV1.1
Copyright © Shenzhen SOFARSOLAR Co., Ltd
44
1) Battery type settings
Advance
d setup
Enter
password
Enter
0715
Battery
parameter
Batter
y1
1.Battery
type
7.BT
S 5K
Batter
y2
2. Dischar
ge Depth
3. Set the
mandatory
full -
charge
time
2) Set discharge depth: Set the following parameters as required
Discharge depth EPS discharge depthEPS restore the
discharge
3) Set the mandatory full - charge timeThe time difference is no less
than 3 hours
4) Save
Note: If batteries are connected to both battery channels of the inverter,
perform the preceding steps to set battery parameters for batteries 1 and
2.
Configures an address automatically
After battery parameters are set, ensure that the system has reliable PV
or utility power supply.
Advance
d setup
Enter
password
Enter
0715
Battery
parame
ter
Configu
res an
address
automa
tically
Configure
s an
address
automatic
ally
Confi
rm
Note
The online batteries quantity is displayed on the auto IP address
configuration page. You can configure the IP address
automatically only after comparing the connected batteries

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Sofar solar BTS Series and is the answer not in the manual?

Sofar solar BTS Series Specifications

General IconGeneral
BrandSofar solar
ModelBTS Series
CategoryBattery Pack
LanguageEnglish

Related product manuals