BTS E5~20-DS5 user manualV1.1
Copyright © Shenzhen SOFARSOLAR Co., Ltd
708*170*900mm
708*170*1100
mm
Refer to BTS E5~20-DS5 configuration list
Battery Distribution Unit
Max. charge/ discharge
current
UN38.3, IEC62619, IEC62040-1, SAA etc.
[1]Test conditions:0.2C charge/discharge at 25℃,100%DOD.
[2]Usable Energy is based on battery cell only.
[3]Refer to the temperature derating curve.
[4]If the altitude is >2000m, derating operation is required, refer to the
derating curve.