BTS E5~20-DS5 user manualV1.1
Copyright © Shenzhen SOFARSOLAR Co., Ltd
The personnel responsible for installation and maintenance of the
equipment for the first voyage must first receive strict training, understand
various safety precautions and master correct operation methods.
Only qualified professionals or trained personnel are allowed to
install, operate, and maintain the device.
Only qualified professionals are allowed to remove safety facilities
and repair devices.
The personnel, including the operators, trained personnel, and
professional personnel, who operate the equipment should have the
special operation qualification required by the local state, such as the
qualification of high voltage operation, height climbing, and special
equipment operation.
Only professional or authorized personnel can replace equipment or
components (including software).
Note:
Professional personnel: those who have the training or operation
experience of equipment and are able to understand the potential
sources and magnitude of hazards in the process of equipment
installation, operation and maintenance.
Trained personnel: personnel who have received the appropriate
technical training and have the necessary experience are aware of
the risks that may be posed to them in performing a certain operation
and can take measures to minimize the risks to themselves or other
personnel.
Operators: operators who may have access to the equipment except
trained and professional personnel.
Assembly Condition
Assemble the BTS intelligent battery system as detailed in the following
sections of this manual. Place the battery in a position that can be fixed