A
18 MAN-01-00786-1.3
Pre-commissioning when AC Power is Not Connected (Option 1)
15
1 3 4
Download SolarEdge SetApp
Start
Download
Start and follow SetAppConnect power bank
2
Turn switch to ON
ON
Power bank: 60W
output port , USB-C
Power Delivery (PD):
20V 3A (not provided)
Cover connector
when not used
5
7
6
Disconnect and remove power bank
Wait until inverter turns-off (all LEDs turn-off)
Turn switches to OFF
3.3 ft / 1 meter, USB-C / USB-C (not provided)