3. When the activation is complete, do one of the following:
Select Activate Another Inverter to continue activating additional inverters.
Select Start Commissioning for pairing and other system configuration. The
Commissioning screen is displayed. Refer to the next section for more
information.
Step 2: Commissioning and Configuring the
Installation
This section describes how to use the SetApp menus for commissioning and
configuring the inverter settings.
Menus may vary in your application depending on your system type.
To access the Commissioning screen:
Do one of the following:
During first time installation: Upon Activation completion, in the SetApp, tap Start
Commissioning. The main Commissioning menu screen is displayed.
Commissioning
Country and Language
Pairing
Communication
Device Manager
Maintenance
Information
Status
If the inverter has already been activated and commissioned:
Chapter 4: Activating, Commissioning and Configuring the System 43
EV Charging Single Phase Inverter Guide MAN-01-00588-1.1

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SolarEdge SE7600H-US and is the answer not in the manual?

SolarEdge SE7600H-US Specifications

General IconGeneral
ModelSE7600H-US
AC Power Output7600W
Max Efficiency99%
Enclosure RatingNEMA 4X
Nominal AC Voltage240V
AC Voltage Range211 - 264V
Max Output Current32A
Max Inverter Efficiency99%
Nighttime Power Consumption<2.5W
MPPT Voltage Range380 - 480V
Max Input Voltage480V
Number of MPP Trackers1
CoolingConvection
Operating Temperature Range-40°F to +140°F (-40°C to +60°C)
Communication InterfacesRS485, Ethernet
Warranty12 years