EasyManua.ls Logo

SolaX Power T-BAT-SYS-HV-R2.5 - Decommissioning; Dismantling the Battery; Packing

SolaX Power T-BAT-SYS-HV-R2.5
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7. Troubleshooting
8. Decommissioning
BMS_Flash_Fault
BMS_Precharge_Fault
Error
Description
Diagnosis & Solution
BMS_Break
Disconnection
fault of BMS
Flash fault of
BMS
Memory chip fault.
Restart BMS;
Contact the Company's after-sales
personnel.
External short circuit of BMS.
Check the external connection and
restart BMS;
Contact the Company's after-sales
personnel.
BMS_AirSwitch_Break
Disconnection of
switch break of
BMS
Disconnection of switch break of BMD.
Restart BMS;
Contact the Company's after-sales
personnel.
BMS
precharge fault
BMS sampling fault.
Restart BMS;
Contact the Company's after-sales
personnel.
8 Decommissioning
8.2 Packing
Dismantling the Battery
8.1
52
53
Shutting down the battery unit
Disconnect the cables between the BMS and inverter;
Disconnect the series wiring terminal on the battery;
Disconnect the cables.
Pack the BMS and battery modules in the original packaging.
If the original packaging is no longer available, use an equivalent carton or box that
meets the following requirements:
Suitable for loads over 154.32 lbs/70.00 kg;
Properly closed and sealed.

Related product manuals