Commissioning
6
※ 6.1 App Preparation
①
②
Register an account on the Cloud monitoring App. If you have got the account and
※ 6.2 Inspection Before Commissioning
①
All equipment has been reliably installed.
②
DC switch and AC circuit breaker are in the "OFF" position.
③
The ground cable is properly and reliably connected.
④
The AC cable is properly and reliably connected.
⑤
The DC cable is properly and reliably connected.
⑥
The communication cable is properly and reliably connected.
⑦
The vacant terminals are sealed.
⑧
⑨
The AC circuit breaker is selected in accordance with the requirements of this manual
and local standards.
⑩
All warning signs & labels are intact and legible.
※ 6.3 Commissioning Procedure
①
Turn on the AC breaker.
②
equipped.
③
the customer.
④
the weather and grid meet requirements. The time for entering the operating mode may
⑤