EasyManua.ls Logo

SPACEMAKER EL64 - Care and Maintenance; Door Installation (from Inside); Door Adjustment (from Inside)

SPACEMAKER EL64
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
STEP
22
22
2
11
11
1
18
L18
DOOR INSTALLATION
(FROM INSIDE)
Inside and near the corner of build-
ing, install bottom lip of left door
into track formed in base rail.
Position top of door so that holes
in door line up with CENTER holes
in door glide. Fasten door glides
to door with 10mm (3/8") long bolts
and nuts from THE INSIDE.
See "A"
Install right hand door in the same
manner.
1.
2.
3.
DOOR TRACK
"A"
DOOR HANDLE
INSTALL DOOR INTO TRACK IN BASE RAIL
AND TILT UP INTO PLACE
USE 10mm (3/8")
LONG BOLTS
AND NUTS
INSIDE OF BUILDING
ADJUST BOLT LOCATION
IN THESE 3 HOLES
FOR SQUARE FIT
STEP
2222
2222
22
DOOR ADJUSTMENT (FROM INSIDE)
Close doors to see if they meet squarely. There are 3
holes in each of the door glides to raise or lower doors
as required for a square fit.
1.
No. A67
CARE AND MAINTENANCE
Finish: For long lasting finish, periodically clean and wax the exterior surface. Touch up scratches
as soon as you notice them on your building. Immediately clean the area with a wire brush; wash
it and apply touch up paint per manufacturer’s recommendation.
Roof: Keep roof clean of leaves and snow with long handled, soft bristled broom. Heavy amounts
of snow on roof can damage the building making it unsafe to enter.
Doors: Keep doors closed to prevent wind damage.
Fasteners: Regularly check your building for loose screws, bolts, nuts, etc. and retighten them as
necessary.
Moisture: With changing temperatures, condensation can accumulate inside the building.
Other Tips: A non-corrosive caulking is helpful to seal the building.
Do not store swimming pool chemical in your building. Combustibles and corrosives must be stored
in airtight containers.