FROZEN PRODUCT OPERATION
Verify cylinder is full of
mixed product and
primed
Turn power switch to
FREEZE position
The motor will begin to
agitate the product, and the
cooling system will begin to
freeze the product
Freezing product
takes approximately
10 minutes
When product reaches the set
viscosity, it is ready to dispense
(viscosity can be changed in the
Settings menu, Page 19)
I. FREEZE PRODUCT
Spaceman USA 6210 Training rev111918