AEL3 Electric Linear Actuators AEL3 Electric Linear Actuators
Actuators supplied already fitted to control valves would be supplied already commissioned. However, should
it be necessary to commission an actuator, the following procedure should be adopted.
4.1 Preliminary checks - All actuators
1. Check that the actuator voltage corresponds to that required.
2. Ensure the wiring corresponds to that outlined in Section 3.3 or 3.7.
3. Ensure the assembly of the valve and actuator has been carried out according to the instructions in
Section 3.2.
4. Commissioning
Always make sure that the electrical supply is switched off when carrying out maintenance
on the actuator or valve.
There are no maintainable parts within the actuator.
5. Maintenance