EasyManua.ls Logo

Stahl SLE 3 - 5.5 Documentation of changes to the cut-off point

Default Icon
33 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5 Commissioning, tests, settings and maintenance
22 06.2017
BA_SLE3_EN.DOCX
5.5 Documentation of changes to the cut-off point
DANGER
After testing of the new cut-off point, it must be documented in the cover of the device, in
the following table and in the crane logbook with signatures and confirmed.
Failure to document a change in the cut-off point will lead to immediate loss of the
warranty and is grossly negligent.
Setting
Reason for change
Operator's
signature
Service techni-
cian's signature
NOTICE
There is a page with a table as shown above at the end of these operating instructions.
This page can be taken out (or copied) and used to document changes to the settings of
the SLE 3 in the test book.
S1
S4
S2
S3
ON
Date _______________
Modified Setup
Device Rev._________
S1
S4
S2
S3
ON
Date _______________
Modified Setup
Device Rev._________
S1
S4
S2
S3
ON
Date _______________
Modified Setup
Device Rev._________
S1
S4
S2
S3
ON
Date _______________
Factory Setup
Device Rev._________

Related product manuals