3.4 Installing the Lag Bolts
3.4.1 Refer to Figure 3 and, using a plumb bob from the header, MARK the locations for the
two O panel lag bolts. Note the two block mounting options shown in Figure 3.1.
3.4.2 INSTALL the two
3
/
8
X 2 expansion shields.
3.4.3 INSTALL the two
3
/
8
X 2 lag bolts.
3.5 Installing the O-Panel(s)
3.5.1 Refer to Section 3.2, and INSTALL top and bottom rails onto O panel glass.
3.5.2 Refer to Figure 3, and INSTALL O-panel pressure-sensitive pile on trailing glass pane.
3.5.3 Refer to Stanley Access Technologies document No. 203590, “Dura-Glide 2000
Installation Manual,and INSTALL the O-panel(s).