TARA SOLID FUEL CENTRAL HEATING STOVE
INSTALLATION & OPERATING INSTRUCTIONS
GENERAL
When installing, operating and maintaining your
Tara Stove respect basic standards of fire safety.
Read these instructions carefully before commenc-
ing the installation. Failure to do so may result in
damage to persons and property. Consult your local
Municipal office and your insurance representative
to determine what regulations are in force. Save
these instructions for future reference.
Please note that it is a legal requirement under
England & Wales Building Regulations that the
installation of the stove is either carried out under
Local Authority Building Control approval or is
installed by a Competent Person registered with a
Government approved Competent Persons
Scheme. HETAS Ltd operate such a scheme and a
listing of their Registered Competent Persons can
be found on their website at www.hetas.co.uk.
Special care must be taken when installing the stove
such that the requirements of the Health & Safety at
Work Act are met.
Handling
Adequate facilities must be available for loading,
unloading and site handling.
Fire Cement
Some types of fire cement are caustic and should
not be allowed to come into contact with the skin. In
case of contact with the skin wash immediately with
plenty of water.
Asbestos
This stove contains no asbestos. If there is a possi-
bility of disturbing any asbestos in the course of
installation then please seek specialist guidance and
use appropriate protective equipment.
Metal Parts
When installing or servicing this stove care should
be taken to avoid the possibility of personal injury.
“IMPORTANT WARNING”
This stove must not be installed into a chimney that
serves any other heating appliance.
7
The complete installation must be done in accor-
dance with current Standards and Local Codes. It
should be noted that the requirements and these
publications may be superseded during the life of
this manual.
Please refer to the current standards, BS EN 15287-
1:2007 Design, Installation and Commissioning of
chimneys. BS EN 14336:2004: Heating Systems in
Buildings. Installation & Commissioning of Water
Based Heating Systems. BS EN 12828: 2003;
Heating Systems in Buildings. Design of Water
Based Heating Systems. BS EN 12831: 2003;
Heating Systems in Buildings. method for
calculation of the design heat load.
PRE-INSTALLATION ASSEMBLY
1. After removing the stove from its packaging,
open the firedoor and remove all contents
from the ashpan.
2. Fit the firedoor handle by screwing into the
firedoor axle (see Fig. 1).
3. Remove the stove from the pallet and posi-
tion it in the final installation position (see
location and clearance to combustibles).
Your Tara stove is supplied with:
• Timber handle or Black Spring Handle
Assembly (Cream Only)
• Glove (Cream Only)
• Ashpan
• Operating Tool
• Ashtray
• Touch-up Paint (Enamel Only)
• Installation and Operation Manual
Fig.1
ELECTRICAL CONNECTIONS
The installation of any electrical services during the
installation of this stove must be carried out by a
registered competent electrician and in accordance
with the requirements of the latest issue of BS 7671.
Wooden Handle
Spring Washer
Rnd Hd Screw
Components for
Wooden Handle
Components for
Spring Handle
Nylon Cap Washer
Spindle
Spring Handle
Increasing Collar
End Cap