EasyManua.ls Logo

STATUS SCIENTIFIC CONTROLS MCU3 - Page 23

Default Icon
61 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TD06/001
Issue:
6
Change Note:
1696
Page 3-5
The correct wiring method for all Status Scientific FGD2 / FGD3 Detector Heads (in a non-
hazardous location) is shown above. It is important to note that this drawing shows the wiring
connections but does not discuss the Input Module configuration. Prior to connecting the Detector
Head ensure the Input Module is correctly configured (refer to section 4.1).
Note:
The screens from each cable are connected to the chassis earth of the control unit. The
connection between the system 0V and the earth of the chassis is made by fitting Jumper J1
located on the distribution board.
For installation diagrams for FGD Flammable Gas Detector Heads refer to section 3.3.
- +
4-20mA Loop
Screen
Connection diagram for FGD2/3 Oxygen or
Toxic Detector in a Non-Hazardous area
Earth
Note: Distribution
board Link J1 must be
fitted.
21
22
23
24
Input Module

Table of Contents