EasyManua.ls Logo

Steca StecaGrid 8 000+ 3ph - Mounting the Inverter; Mounting Rail Installation; Hanging the Inverter

Steca StecaGrid 8 000+ 3ph
47 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8.2 Mounting the inverter
Fastening the mounting rail
1
2
3
2
3
4
1. Cover the upper ventilation holes of the inverter that lie be-
low the mounting position (protection from drilling dust).
2. Fasten the mounting rail level on the mounting surface using
at least 2 stainless steel screws, as shown in the illustrations
at the left. Observe the following:
At least 2, or a maximum of 4, stainless steel screws are
required, depending on the load-bearing capacity of the
mounting surface.
Use screws and dowels etc. of a size appropriate for the
weight of the inverter.
The main part of the mounting rail must lie flat on the
mounting surface with the attachment area for the
inverter casing facing upwards.
Hanging the inverter on the mounting rail
3
2
4
1
5
6
Caution
Danger of personal injury. The inverter weighs 42 kg.
• Always carry the inverter using at least two people.
• Use the handle to carry the device.
Caution
Danger from hot surfaces. Allow hot inverters to cool
down before touching.
1. Hang the inverter on the mounting rail . Position the
inverter so that the sheet metal tongue slides into the cor-
responding recess on the mounting rail (between the mount-
ing areas for the casing).
2. Fasten the inverter to the mounting surface through the
fastening holes , using 2 suitable stainless steel screws and
dowels etc.
Note
The procedure for removing the inverter from the mounting rail is
described in 8.10, p. 66.
58
744.378 | 12.13
EN

Related product manuals