Tech Support: consumer.steppir.com/support | 425.453.1910 | support@steppir.com
24
Section 1.7: BigIR Wiring Diagram (skip if you have pre-wired cable)
WIRING
25 PIN DSUB FIELD SPLICE
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
G
B
R
G
W
Red
Black
White
Green
Red
Black
White
Green
To Coil
Attach ring
terminals to
wire ends
To EHU
Shield
EHU
Coil
*Ensure that the shield wire for both the EHU and loading coil connect
to the “G” terminal on the DB25 connector, and trim them at the EHU/
coil so they are not connected to anything.