INSTALLATION
Preparations
4. Preparations
4.1 Installation site
To be able to open the front door freely, maintain a minimum
clearance on the r.h. side and in front of the appliance.
The required room height depends on whether the reversing hood
is used or whether the hoses are connected directly (see chapter
"Installation site/ Minimum clearances").
Maintain a minimum clearance on the r.h. side of the appliance
for service work.
Never install the appliance in wet rooms.
The room in which the appliance is to be installed must meet the
following conditions:
- The room must be free from the risk of frost.
- The floor must have sufficient load-bearing capacity. In ad-
dition to the appliance weight, also take that of the cylinder
content into account.
- The substrate must be horizontal, level, solid and permanent.
- When installing the appliance inside a boiler room ensure
that the boiler operation is not impaired.
- The quantity of refrigerant makes it necessary to observe
the minimum volume of the installation room (see chapter
"Specification/ Data table").
!
Material losses
The floor of the installation room must be water resistant.
During appliance operation, the outdoor air releases up
to 50l of condensate per day. In the case of deficient or
inadequate maintenance, water may escape. We recom-
mend installing a drain in the floor of the installation
room.
4.1.1 Minimum clearances
Outdoor/exhaust air connection with diverter hood
≥2200
1980
≥500
≥100
≥600