EasyManua.ls Logo

Stihl SR 450 - Adjusting the Metering Lever Cable

Stihl SR 450
111 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
56 SR 430, SR 450
: Push the valve lever (1) into the
bore (arrow).
Install the interlock lever and
throttle trigger, b 8.3
Reassemble all other parts in the
reverse sequence.
8.5 Metering Lever, SR 450
: Take out the screw (1) and
remove the cover (2).
Take out the screw (1).
: Remove the metering lever (2)
with cable (3).
0002RA183 TG
1
0002RA184 TG
1
2
0002RA185 TG
1
2
3
Disconnect the cable (3).
Installing
: Push the cable (1) into the
metering lever and engage it in
the slot (arrow).
: Position the metering lever (2)
with cable (3) against the handle
housing.
: Fit the cable (2) in the
guide (arrow).
0002RA186 TG
1
0002RA187 TG
1
2
: Insert and tighten down the
screw (1) firmly.
: Fit the cover (1).
: Insert and tighten down the
screw (2) firmly.
Check operation.
Rotary shutter must be
completely closed in end position
adjust cable if necessary,
b 8.5.1
0002RA188 TG
1
0002RA189 TG
2
1

Table of Contents

Other manuals for Stihl SR 450

Related product manuals