Page 3 of 51
Page No
8. PUTTING INTO OPERATION 25
8.1. Control panel, control knobs & L.E.D. 25
8.2. Sensors 26
8.3. Run and Fault Codes and Display meanings 27
8.4. Display buttons 28
8.4.1 Service Button 28
8.5. Filling and venting the boiler and system for light up 28
8.6. Starting the boiler and Commissioning 29
8.6.1 General 29
8.6.2 Commissioning 29
8.7. Adjusting and setting the output 29
8.7.1 Setting the maximum output 29
8.7.2 Setting the minimum output 31
8.8. Gas conversion 31
9. LONG TERM SHUTDOWN 32
10. LOCK OUT / USER COMPLAINT 33
11. TROUBLESHOOTING 34
11.1. Cause of the fault 34
11.2. Troubleshooting table 36
12. INSPECTION AND MAINTENANCE 38
12.1. General 38
12.2. Inspection 38
12.3. Maintenance 39
13 LPG Settings
SCB 60 to 120 40
SCB 150 to 180 41
14 EXPLODED VIEWS AND SPARES 42
14.1Burner, fan, gas pipe, heat exchanger, casing S-CB60 – S-CB120 43
14.1.1Spare Parts S-CB60 – S-CB120 44
14.2.Burner fan, gas pipe, heat exchanger, casing S-CB150 – S-CB180 45
14.2.1 Spares Parts S-CB150 – S-CB180 46
14.3 Pipelines & pumps S-CB60 – S-CB120 47
14.3.1 Spare Parts S-CB60 – S-CB120 48
14.4 Pipelines & pumps S-CB150 – S-CB180 49
14.4.1Spare Parts S-CB150 – S-CB180 50